Electrical Service Buriel Depth E3703

This picture was taken today. The loader operator knew he was over the electrcal service, but he didn’t know how shallow it was.  According to table E3703.1 it only has to be 6 inches if burried in metal conduit.
Electrical Service Hit

Electrical Service Hit

It’s only 3-4 inches deep whre it goes into the house.

Electrical Service Buriel Depth

Electrical Service Buriel Depth

It did Arc and Spark

Arc and Spark

Arc and Spark